-We ran plumbing to the bathroom.
-Installed all the light boxes
-Ran wire for light boxes
-Did all of the ductwork. This is probably one of the areas I am most proud. We had to cut into the existing ducts and attach the additional ducts and it was pretty cool.
-Cut out the door and window under the stairs.
Overall, we are feeling great and hopefully will have sheetrock in a couple of weeks. We need to finish plumbing, install the tub, and the fan to the bathroom and then finish a few other projects and we'll be ready for sheetrock.